Evaluation of reliability, availability and maintainability of back-up locomotives in earth pressure balance tunnel boring machine (EPB-TBM): A Case study: Tabriz Metro Line ۱,

AuthorsChakeri, H., Aghababaei, H., Darbor, M., Mostafaei Daneshmand, H.
JournalIranian Journal of Mining Engineering
Page number۶۸-۸۸
Volume number۱۷
Paper TypeFull Paper
Published At۲۰۲۲-۱۲
Journal TypeTypographic
Journal CountryIran, Islamic Republic Of
Journal IndexISC

Abstract

Paper URL