An Approach to Evaluate the User Participation Pattern in Highway's Volunteered Geographic Information using Machine Learning | Quarterly Journal of Transportation Engineering | R Ali Abbaspour - A Chehreghan - S Sadati - A Abedini |
An approach to assess the role of features in detection of transportation modes | Transportation | S Sowlati - R Ali Abbaspour - A Chehreghan |
Acoustic analog-to-digital converter using coupled waveguides in phononic crystals | Mechanics of Advanced Materials and Structures | K. Tahriri - A. Bahrami - F. Motaei - H. Hu |
A review of phononic-crystal-based energy harvesters | Progress in Energy | A. Bahrami - F. Motaei |
The influence of fiber-reinforced shotcrete on the ground settlement in tunnel excavation: A case study of Tabriz metro line 2 | International Journal of Mining and Geo-Engineering | Khoshzaher, E., Miri Darmarani, Sh., Chakeri, H., Darbor, M., Haghkish, H |
Experimental and numerical investigation of the TBM disc cutter wear using a new tunnel boring machine laboratory simulator | Heliyon | Chakeri, H., Darbor, M., Shakeri, H., Mousapour, H., Mohajeri, V |
Stability analysis and design of support system for adits of the gold deposits of Mazraeh-Shadi using numerical modeling | Journal of Analytical and Numerical Methods in Mining Engineering | Darbor, M., Chakeri, H., Manafi, M., Balani, A |
The effect of soil and grout mixture on the ground surface settlement in mechanized excavation | Journal of Mining and Environment | Barri, F., Chakeri, H., Darbor, M., Haghkish, H |
برنامه ریزی خط لوله چند فرآورده ای در شرایط عدم قطعیت تقاضای روزانه مشتریان | مجله تحقیق در عملیات و کاربردهای آن | تقی نژادنعمت الله، ناصری سید هادی، مرادی سجاد |
ارائه روشی برای انتخاب کوتاه ترین مسیر مقید با استفاده از برش های منطقی | تصمیم گیری و تحقیق در عملیات | مرادی سجاد، کرمعلی غلامرضا |
یک مدل برنامه ریزی خطی عدد صحیح آمیخته برای زمانبندی پرورش ماهی در زنجیره های مختلف و مدیریت تقاضای مشتریان | تصمیم گیری و تحقیق در عملیات | سجاد مرادی |
Algorithm for long-term scheduling of multi-product pipelines | Industrial & Engineering Chemistry Research | MirHassani,S. A; Moradi, S; Taghinezhad, N |
Operational scheduling of refined product pipeline with dual purpose depots | Applied Mathematical Modelling | MirHassani, S. A; Abbasi, M; Moradi, S |
Transportation planning for petroleum products and integrated inventory management | Applied Mathematical Modelling | Moradi, S; MirHassani, S. A |
Robust scheduling of oil pipelines under demand uncertainty | The International Journal of Advanced Manufacturing Technology | Moradi, S; MirHassani, S. A |
Efficient decomposition-based algorithm to solve long-term pipeline scheduling problem | Petroleum Science | Moradi, S; MirHassani, S. A; Hooshmand, F |
Fuzzy facility location problem with point and rectangular destinations | International Journal of Mathematics in Operational Research | Taghinezhad, N; Moradi, S; Karamali, Gh |
Selecting the robust constrained shortest path under uncertainty | International Journal of Industrial and Systems Engineering | Moradi, S; Taghinezhad, N |
Simultaneous planning of purchase orders, production, and inventory management under demand uncertainty | International journal of production economics | Zamani, D; Moradi, S; Alizadeh, B |
A stochastic chance-constraint framework for poultry planning and egg inventory management | Operations management research | Zamani, D; Moradi, S; Alizadeh, B |